Demolition / new construction of parking garage Betten

  • Client: Bettmeralp Bahnen AG, 3992 Bettmeralp
  • Site management/reference person: VWI Ingenieure AG, Naters/Zurwerra Philipp
  • Site manager/foreman: Zenklusen Nicolas / Steiner Erich
  • Construction time: February 2017 to December 2017
  • Construction costs: CHF 8.97 million

Technical data:

  • 19,500 m2 mono concrete
  • 200 prefabricated pillars
  • 6'000 m3 concrete
  • 1'000 m2 shotcrete with anchors
  • 2'000 m3 Concrete demolition
  • 17'000 m2 Prefabricated ceiling slabs
  • 10'000 m3 excavation

Project description:

The construction work was carried out by the consortium Walpen AG / Frutiger AG and Ruppen Peter AG.

  • Lead management: Walpen AG
  • Tech. Management: Walpen AG
  • Commercial management: Frutiger AG


The new Betten parking garage project comprised the following work:

Civil engineering works:

  • Demolition of existing parking garage:
  • Demolition of existing parking garage (concrete, steel, sheet metal)
  • Excavation work incl. securing the excavation pit, demolition work in the surrounding area, backfilling, infrastructure pipes, drainage as well as landscaping work and asphalt work.



New construction of parking garage:

  • Concrete work (formwork, reinforcement, concrete), prefabricated concrete ceilings, prefabricated supports and flooring of the parking areas.
  • The new parking garage has a total of 658 parking spaces.


Requirements:

  • Short construction time (start demolition of old parking garage 13.03.2017 / opening of new parking garage 16.12.2017)
  • Complex project