Saas-Fee

district heating plant

  • Client: Enalpin
  • Construction management/contact person: Simon Murmann, SBP
  • Site manager: Mathias Wyssen
  • Foreman: Horst Theler
  • Construction period: March 2024 – September 2025
  • Construction costs: CHF 3.0 million

Technical data: 

  • 32 cast-in-place concrete piles
  • 3380 m² wall formwork
  • 1000 m² ceiling formwork
  • 185 tons of reinforcement
  • 1650 m³ concrete

Property description: 

A modern district heating plant was built in Saas Fee. The building rests on stable in-situ concrete piles, which ensure a secure and durable foundation.

Requirements:

  • Concrete walls up to 8 m high.
  • Very little installation space
  • Construction at helicopter landing site

Special features:

  • Excavated material was contaminated by a former landfill site. To avoid having to dispose of this at a landfill site, the excavated material was processed on site and refilled.