- Client: Enalpin
- Construction management/contact person: Simon Murmann, SBP
- Site manager: Mathias Wyssen
- Foreman: Horst Theler
- Construction period: March 2024 – September 2025
- Construction costs: CHF 3.0 million
Technical data:
- 32 cast-in-place concrete piles
- 3380 m² wall formwork
- 1000 m² ceiling formwork
- 185 tons of reinforcement
- 1650 m³ concrete
Property description:
A modern district heating plant was built in Saas Fee. The building rests on stable in-situ concrete piles, which ensure a secure and durable foundation.
Requirements:
- Concrete walls up to 8 m high.
- Very little installation space
- Construction at helicopter landing site
Special features:
- Excavated material was contaminated by a former landfill site. To avoid having to dispose of this at a landfill site, the excavated material was processed on site and refilled.