Naters

Excavation pit for multi-family residential building

  • Client: Wohnart Bau AG
  • Construction management/contact person: Machart Architektur / Mariella Ruppen
  • Site manager: Iwan Rieder
  • Foreman: Erich Steiner
  • Construction period: May – July 2024
  • Construction costs: CHF 360,000

Technical data:

  • 905 m³ topsoil and turf removal 
  • 4800 m³ excavation 
  • 377 m³ material replacement 
  • 135 m² shotcrete (slope stabilization) 

Property description:

We carried out the excavation work for the new MFH Wohnart residential building in Naters. 

Requirements:

The excavation work was carried out in a residential area. 

The work had to be carried out using the lowest-emission methods and with appropriate measures to minimize noise, dust, vibration, and environmental pollution. 

In addition, the earthworks had to be carried out in coordination with the third-party contractor responsible for the geothermal probe drilling, which was successfully implemented.

 