- Client: Wohnart Bau AG
- Construction management/contact person: Machart Architektur / Mariella Ruppen
- Site manager: Iwan Rieder
- Foreman: Erich Steiner
- Construction period: May – July 2024
- Construction costs: CHF 360,000
Technical data:
- 905 m³ topsoil and turf removal
- 4800 m³ excavation
- 377 m³ material replacement
- 135 m² shotcrete (slope stabilization)
Property description:
We carried out the excavation work for the new MFH Wohnart residential building in Naters.
Requirements:
The excavation work was carried out in a residential area.
The work had to be carried out using the lowest-emission methods and with appropriate measures to minimize noise, dust, vibration, and environmental pollution.
In addition, the earthworks had to be carried out in coordination with the third-party contractor responsible for the geothermal probe drilling, which was successfully implemented.