Goppisberg/Greich

fire water supply

  • Client: Municipality of Riederalp
  • Construction management/contact person: Emch + Berger Group
  • Site manager: Rafael Millius
  • Foreman: Nenad Dugic
  • Construction period: May 2020 – November 2021
  • Construction costs: CHF 330,000

Technical data:

  • 3,500 m³ excavation
  • 1,000 m³ backfilling
  • 2,500 m² wall formwork
  • 1,000 m² ceiling formwork
  • 84,000 kg reinforcement
  • 750 m³ concrete

Project description:

  • Relocation/renewal of drinking water and fire water pipes 
  • Relocation of a pressure breaker shaft 
  • Relocation of two pressure reducing valve shafts 
  • Relocation of a new reservoir 
  • Relocation of several new hydrants 
  • Connection of various stables and chalets to the new main pipe 
  • Laying cable protection pipes for power and data supply 
  • Relocating cable pull shafts 
  • Laying sprinkler pipes 

Requirements:

  • Mountain construction site 
  • Steep terrain
  • Short construction period
  • Material management
  • Logistics and transport with helicopter and crawler dumper

 