Baltschieder

HWS Baltschiederbach bedload barrier

  • Client: Municipality of Baltschieder
  • Site management / reference person: Nicola Kalbermatten
  • Site manager: Mathias Wyssen
  • Deputy foreman: Iwan Rieder
  • Foreman: Diego Cathrein
  • Construction period: May/2021 - Sept./2023
  • Construction costs: CHF 11'000'000.-

Technical specifications

  • Face concrete 9'000m3
  • Mass concrete 10'000m3
  • Reinforcement 1'300 tons
  • Excavation 40'000m3

Project description

At the HWS Baltschiederbach construction site, the existing dam is being raised to protect the residents of Baltschieder from future storms.

Requirements

  • Wall formwork with up to 30 degrees of tightening
  • Special types of concrete
  • High walls
  • Work near the river

Contact persons

Mathias Wyssen

Technician HF / Construction Foreman SBA

+41 79 812 09 39

+41 27 948 05 48

mathias.wyssen@volken-group.ch