- Client: Municipality of Baltschieder
- Site management / reference person: Nicola Kalbermatten
- Site manager: Mathias Wyssen
- Deputy foreman: Iwan Rieder
- Foreman: Diego Cathrein
- Construction period: May/2021 - Sept./2023
- Construction costs: CHF 11'000'000.-
Technical specifications
- Face concrete 9'000m3
- Mass concrete 10'000m3
- Reinforcement 1'300 tons
- Excavation 40'000m3
Project description
At the HWS Baltschiederbach construction site, the existing dam is being raised to protect the residents of Baltschieder from future storms.
Requirements
- Wall formwork with up to 30 degrees of tightening
- Special types of concrete
- High walls
- Work near the river