- Client: Brigger Immobilien AG
- Construction management / contact person: Bpm Schmidt AG
- Site manager: Thomas Imhof
- Deputy construction manager: Iwan Rieder
- Foreman: Hugo Gasser
- Construction period: September 2023 to July 2024
- Construction costs: CHF 1.2 million
Technical data:
- 1,200 m² ceiling formwork
- 2,000 m² wall formwork
- 80 tons of reinforcement
- 950 cubic meters of concrete
- 400 m² masonry
Property description:
The Hofji apartment building was constructed on a steep slope with very little installation space over four floors. The excavation pit was closed off with a shotcrete wall secured with 51 nails. The lift was constructed using prefabricated concrete elements.
Requirements:
- Short construction time
- Very small installation area
- Difficult working conditions on a slope
- On-time implementation
- Shotcrete wall with 51 nails
- Prefabricated lift elements and stair elements