Brig

MFH Hofji

  • Client: Brigger Immobilien AG
  • Construction management / contact person: Bpm Schmidt AG
  • Site manager: Thomas Imhof
  • Deputy construction manager: Iwan Rieder
  • Foreman: Hugo Gasser
  • Construction period: September 2023 to July 2024
  • Construction costs: CHF 1.2 million

Technical data: 

  • 1,200 m² ceiling formwork 
  • 2,000 m² wall formwork  
  • 80 tons of reinforcement 
  • 950 cubic meters of concrete 
  • 400 m² masonry 

Property description: 

The Hofji apartment building was constructed on a steep slope with very little installation space over four floors. The excavation pit was closed off with a shotcrete wall secured with 51 nails. The lift was constructed using prefabricated concrete elements.

Requirements: 

  • Short construction time  
  • Very small installation area 
  • Difficult working conditions on a slope 
  • On-time implementation   
  • Shotcrete wall with 51 nails 
  • Prefabricated lift elements and stair elements 