- Client: Baugemeinschaft Nelkenweg, p.A. bpm Schmid
- Site management / Reference person: Schmid Peter bpm Schmid
- Site manager: Antonio D'Onofrio
- Foreman: Cathrein Diego
- Construction period: Sept. 2018 - June 2019
- Construction costs: 2.8 million
Technical data:
- Reinforcement 410 t
- Concrete 4100 m3
- Wall formwork 6'600 m2
- Slab formwork 5'800 m2
- Masonry m2 2'700 m2
Property description:
The property is an apartment building with a parking garage, first floor and three upper floors above. The surrounding walls of the parking garage are made of in-situ concrete, while those on the ground floor to 3rd floor are made of in-situ concrete and partly brick.