- Client: FC Termen / Ried-Brig
- Site management / Reference person: SPI Schmidhalter Partner Ingenieure / Iwan Rieder
- Site manager: D'Onofrio Pierluigi
- Foreman: Cathrein Diego
- Construction time: May 2019 to August 2019
- Construction costs: CHF 500,000
Technical data:
- 4,500 m3 excavation / removal
- 250 m3 Excavated trenches
- 1,700 m3 Gravel 16/45
- 250 m3 St. Jacob's mixture 0/22
- 4,500 m2 Bentonite mat
- 260 m edge closures
- 260 m cable protection pipes
- 650 m drainage pipes
- 80 tons of asphalt
- 85 m3 structural concrete
- 8 tons of reinforcement
Project description:
The location of the football pitch is defined by the width of the pitch with a safety margin and the existing space between the road and the existing sports field. Retaining walls in in-situ concrete were built to compensate for the differences in height. The entire football pitch is irrigated with a sprinkler system and drained with drainage pipes. Underneath the artificial turf and the elastic layer, a St. Jakob layer was laid using an asphalt paver with a tolerance of + - 10mm.
Requirements:
- Leveling accuracy below artificial turf Structure