Agarn

New construction of drinking water power plant, lot 2

  • Client: Municipality of Agarn
  • Site management/reference person: Bumann - Bonvin AG / Josef Bumann, Martin Arnold
  • Site manager: Iwan Rieder
  • Foreman: Daniel Maric / Diego Bodenmann
  • Construction period: March 2025 - Oct 2025
  • Construction costs: CHF 950,000

Technical data:

  • 2900m of utility line construction Cable ducts and shafts
  • 2100m³ excavation pit Central
  • 2500m³ trench excavation pressure pipe
  • 250m³ in-situ concrete construction central
  • 35 tons of reinforcement

Project description:

In connection with the new construction of the Agarn drinking water power plant, we carried out the construction work for lot 2. The work included the construction of two new control centers (Agarn control center and Asp control center) in in-situ concrete, as well as the excavation work for the relocation of the new pressure pipeline. The trench for the new pressure line extended over a length of approx. 1200 m in rough terrain.

Using the appropriate equipment (walking excavator), the work was successfully carried out and completed.

Requirements:

  • Worker for construction of pressure pipeline in rough terrain, earthworks with walking excavator.
  • Coordination of construction of new pressure pipeline with third-party contractor for laying the pipes (Lauber IWISA).

 

 

Contact persons

Diego Barberi

Foreman / Foreman

Daniel Maric

Foreman