- Client: D'Onofrio Pierluigi & Antonio
- Site management / Reference person: D'Onofrio Pierluigi & Antonio
- Foreman: D'Onofrio Pierluigi
- Foreman: Elmar Pfammatter
- Construction period: March 2020 to June 2020
Technical data:
- 1'200 m³ excavated material
- 1'300 m² wall formwork
- 100m² exposed concrete type 3.1 BOK 2
- 500m² slab formwork
- 40 tons of reinforcement
- 400 m³ concrete
- 200m² brickwork
Project description:
A double detached house in solid construction was built in Visp. Due to large spans and cantilevered components, the formwork removal times had to be extended.
Requirements:
- Exposed concrete type 3.1 BOK 2 board structure
- Start of pandemic measures
- Short construction time
- Longer stripping times
- Elaborate basic construction