- Client: Damian Seewer
- Site management / reference person: Grand Adalbert Architekturbüro Leuk
- Site manager: D`Onofrio Antonio
- Foreman: Pedro Oliveira
- Construction time: August 2019 to July 2020
- Construction costs: 2.7 million
Technical data:
- 4500 m3 excavation
- 3000 m3 concrete
- 350 tons of reinforcement
- 1000 m2 brick masonry
- 4800 m2 wall formwork
- 2600 m2 slab formwork
- 150 m2 multilayer slab made of rock wool
Project description:
New construction of the Leukersonne winery in Susten. The barrique cellar is in the basement. The wine production, sales/tasting, storage and offices are located on the first floor and upper floor. The walls and ceilings of the basement are made of in-situ concrete. The walls and ceilings of the hall are made of in-situ concrete and partly of prefabricated concrete elements.
Requirements:
- Building in groundwater
- Groundwater lowering (open dewatering)
- White tank
- Very short construction time
- Large spans ( industrial construction )
- Combination of concrete prefabrication with in-situ concrete construction
- Ceiling height up to 9 meters
- Complex buildings
- Corona pandemic measures