Susten

New Leukersonne winery

  • Client: Damian Seewer
  • Site management / reference person: Grand Adalbert Architekturbüro Leuk
  • Site manager: D`Onofrio Antonio
  • Foreman: Pedro Oliveira
  • Construction time: August 2019 to July 2020
  • Construction costs: 2.7 million

Technical data:

  • 4500 m3 excavation
  • 3000 m3 concrete
  • 350 tons of reinforcement
  • 1000 m2 brick masonry
  • 4800 m2 wall formwork
  • 2600 m2 slab formwork
  • 150 m2 multilayer slab made of rock wool

Project description:

New construction of the Leukersonne winery in Susten. The barrique cellar is in the basement. The wine production, sales/tasting, storage and offices are located on the first floor and upper floor. The walls and ceilings of the basement are made of in-situ concrete. The walls and ceilings of the hall are made of in-situ concrete and partly of prefabricated concrete elements.

Requirements:

  • Building in groundwater
  • Groundwater lowering (open dewatering)
  • White tank
  • Very short construction time
  • Large spans ( industrial construction )
  • Combination of concrete prefabrication with in-situ concrete construction
  • Ceiling height up to 9 meters
  • Complex buildings
  • Corona pandemic measures


Contact persons