- Client: Municipality of Naters
- Site management/reference person: Martin Rinderknecht Sportrasen GmbH
- Site manager: Yannic Berger / Celine Ludi
- Foreman: Pedro De Almeida Oliveira
- Construction time: June 2025
- Construction costs: 200'000.-
Technical data:
- Artificial turf surface (incl. quartz sand & rubber granules): 6,700?m² Dismantling and professional disposal.
- Edging elements (aluminum): 360?m delivery and installation incl. clamping rail.
- Excavation and bedding for edging elements: approx. 30?cm wide, 25?cm deep, 360?m long incl. clean pointing and concrete bedding.
- Special elements - corner profiles (aluminum): 4 pieces For corners and ends, suitable for the system.
- Demolition corner sleeves (foundations): 4 pieces size approx. 70?×?70?×?100?cm, incl. disposal.
Project description:
- Demolition of the existing artificial turf including quartz sand and rubber carpet pad. Professional removal and disposal of all materials in accordance with regulations.
- Excavation along the existing kerbstone in preparation for adjustment work.
- Relocation of the existing clamping rail to adapt to the new surface structure and to ensure correct edging of the new system.
Requirements:
- Meet deadline