Naters

Renovation of artificial turf sports facility

  • Client: Municipality of Naters
  • Site management/reference person: Martin Rinderknecht Sportrasen GmbH
  • Site manager: Yannic Berger / Celine Ludi
  • Foreman: Pedro De Almeida Oliveira
  • Construction time: June 2025
  • Construction costs: 200'000.-

Technical data:

  • Artificial turf surface (incl. quartz sand & rubber granules): 6,700?m² Dismantling and professional disposal.
  • Edging elements (aluminum): 360?m delivery and installation incl. clamping rail.
  • Excavation and bedding for edging elements: approx. 30?cm wide, 25?cm deep, 360?m long incl. clean pointing and concrete bedding.
  • Special elements - corner profiles (aluminum): 4 pieces For corners and ends, suitable for the system.
  • Demolition corner sleeves (foundations): 4 pieces size approx. 70?×?70?×?100?cm, incl. disposal.

Project description:

  • Demolition of the existing artificial turf including quartz sand and rubber carpet pad. Professional removal and disposal of all materials in accordance with regulations.
  • Excavation along the existing kerbstone in preparation for adjustment work.
  • Relocation of the existing clamping rail to adapt to the new surface structure and to ensure correct edging of the new system.

Requirements:

  • Meet deadline

 