- Client: Municipality of Bettmeralp
- Construction management/contact person: IBR Ingenieurbüro / Daniel Bumann
- Site manager: Jasin Ajeti
- Foreman: Florian Grand
- Construction period: Phase 1 = 2022 / Phase 2 = 2023
- Construction costs: CHF 800,000
Technical data:
- 450 m3 of pavement removal
- 3,000 m3 of excavation
- 1,000 m3 of backfilling
- 2,500 tons of block rubble
- 2,000 m2 breaking and processing of pavement and foundation layers with Stabi crusher
- 1,000 m3 foundation layers UG 0/45
- 800 tons of pavement
Property description:
Over a length of approx. 4 km, the existing road structure and turning plates will be widened. New machines and transport equipment are becoming increasingly heavy, which means that the road must be maintained and reinforced accordingly. This will stabilize the lanes and rebuild the road surface.
In some places, the existing road structure will be broken up, mixed and compacted before the new surface layer is laid. This will minimize material disposal.