- Client: Municipality of Salgesch
- Construction management / reference person: Reinhard Perren / Zumofen + Glenz AG
- Site manager: Jasin Ajeti / Deputy site manager Gert Adili
- Foreman: Alessandro Salemi
- Construction time: Sept. 24 to March 25
- Construction costs: CHF 725,000
Technical data:
- Approx. 1'400m2 pavement demolition
- Approx. 400m3 trench excavation
- Approx. 1'800m' of service pipes
- Approx. 40 pcs. Control shafts / candelabra etc.
- Approx. 195m3 pipe coating and trench backfilling
- Approx. 1'200m3 Removal of best. Foundation layers
- Approx. 1,200m3 Delivery & installation of foundation layers
- Approx. 310m' edge closures
- Approx. 370 to. Surfacing work
Project description:
The Mulingstrasse in Salgesch is being comprehensively renovated and its infrastructure renewed. The project includes the renewal of the road surface, the adaptation of the service lines and the improvement of traffic safety and drainage. The aim of the renovation is to ensure that the road infrastructure retains its value in the long term and to optimize access for residents and road users.
As part of the work, existing surfaces will be replaced, verges renewed and, where necessary, utility lines modernized. The design takes into account both functional and urban planning requirements and contributes to a sustainable enhancement of the public space.
Requirements:
- Material management
- Short construction time
Special features
- Tight space conditions and logistics