Interceded

Repair of the Lochi Fürgangen embankment

  • Client: DMRU Natural Hazards Department - Rhone Section
  • Site management/reference person: Lukas Lochmatter, INGENES AG
  • Site manager: Celine Ludi
  • Machine operator: Ewald Imboden
  • Construction period: January 2025 and April 2025
  • Construction costs: 350'000.--

Technical data:

  • 1.5km construction slope
  • 6 new groynes
  • New roller shutter Length: 160m Height: 3.20m

Description of the project:

After the storm in July 2024, severe erosion occurred in the bend in Fürgenen am Rotten. During the low water period, the foot of the embankment was stabilized by throwing blocks. Access to the site required the construction of a 1.5 km long construction road.

Requirements:

  • Difficult accessibility
  • Work in the water report

 

Contact persons

Marco Gruber

Foreman