Herbriggen

Repair of village street

  • Client: Municipality of St. Niklaus
  • Construction Manager / Reference Person: SPI AG/ Michelle Bayard
  • Construction Foreman: Celine Ludi
  • Foreman: Orlando Truffer
  • Construction time: March 2023 - October 2024
  • Construction costs: 2.4 million

Technical specifications:

  • 305m length of north road
  • 205m middle construction section
  • 315m south construction section
  • 5,500m³ removal and excavation
  • 750m drainage pipes
  • 3'700 m³ foundation layer
  • 3'450m² surfacing

Object description:

The village road in Herbriggen was completely renovated. The old road surface was removed and the existing pipes for wastewater, drinking water, telecommunications (Swisscom) and electricity were replaced. In addition, the surface water was separated from the sewage system. After the installation of a new foundation layer and the laying of kerbstones, the village street was given a new road surface.

Special requirements:

  • Limited space available
  • Incomplete knowledge of the lines of the old village street