Ried-Brig

Retaining wall at the Basweri valley station

  • Client: Rosswald Bahnen
  • Construction management/contact person: Michelle Bayard
  • Site manager: Mathias Wyssen
  • Foreman: Erich Steiner
  • Construction period: July 2021 - November 2021
  • Construction costs: CHF 400,000

Technical data: 

  • 610m² exposed concrete formwork type 4.1              
  • 165m³ concrete NPKG
  • 240 m³ demolition of retaining wall

Property description: 

The retaining wall at the parking lot for the Rosswaldbahnen had to be replaced. The existing heavy-duty retaining wall was demolished. The new retaining wall was constructed in exposed concrete type 4.1. A bus stop in exposed concrete was then added to the new retaining wall.

Requirements:
  • Exposed concrete type 4.1
  • 6m high walls
  • Slope water

Contact person

Mathias Wyssen

HF technician / SBA construction foreman

+41 27 948 05 15

mathias.wyssen@volken-group.ch

Erich Steiner

Swiss certified foreman

+41 79 664 30 57

erich.steiner@volken-group.ch