- Client: Rosswald Bahnen
- Construction management/contact person: Michelle Bayard
- Site manager: Mathias Wyssen
- Foreman: Erich Steiner
- Construction period: July 2021 - November 2021
- Construction costs: CHF 400,000
Technical data:
- 610m² exposed concrete formwork type 4.1
- 165m³ concrete NPKG
- 240 m³ demolition of retaining wall
Property description:
The retaining wall at the parking lot for the Rosswaldbahnen had to be replaced. The existing heavy-duty retaining wall was demolished. The new retaining wall was constructed in exposed concrete type 4.1. A bus stop in exposed concrete was then added to the new retaining wall.