Rormatta protective dam

  • Client: Municipality of Embd, Flüo 6, 3926 Embd
  • Site management / reference person: IBR Ingenieurbüro GmbH, Daniel Bumann
  • Site manager: Celine Ludi
  • Foreman: Frederic Mammone
  • Construction period: May/2022 - August/2022
  • Construction costs: CHF 400,000

Technical data

  • Rormatte protective dam: length 55 m / height 3.00 m / by means of
    earth-reinforced supporting structure
  • Rormatte protective dam access road with retaining wall on the valley side
  • Rormatte drinking water and wastewater pipe detour
  • In-situ concrete shaft and installation of pressure-reducing valve for drinking water pipe
  • New turning area Rormatte
  • Widening of bend in Rormatte hiking trail by means of
    steel girder construction
  • Creation of Rormatte parking spaces

Project description

The "Rock and boulder fall" hazard map for the Grossstei - Rormatta area was revised. During the revision, it was determined that a large part of the year-round populated area lies in the red hazard zone. The municipality of Embd has drawn up a construction project to ensure the protection of local residents. A new protective dam will be built in the area of the existing turning area to the east (55.00m). The dam will be constructed using an earth-reinforced supporting structure. Before the embankment is built, some preliminary work must be carried out

Requirements

  • Tight space conditions
  • 3D model on excavator