- Client: Municipality of Embd, Flüo 6, 3926 Embd
- Site management / reference person: IBR Ingenieurbüro GmbH, Daniel Bumann
- Site manager: Celine Ludi
- Foreman: Frederic Mammone
- Construction period: May/2022 - August/2022
- Construction costs: CHF 400,000
Technical data
- Rormatte protective dam: length 55 m / height 3.00 m / by means of
earth-reinforced supporting structure - Rormatte protective dam access road with retaining wall on the valley side
- Rormatte drinking water and wastewater pipe detour
- In-situ concrete shaft and installation of pressure-reducing valve for drinking water pipe
- New turning area Rormatte
- Widening of bend in Rormatte hiking trail by means of
steel girder construction - Creation of Rormatte parking spaces
Project description
The "Rock and boulder fall" hazard map for the Grossstei - Rormatta area was revised. During the revision, it was determined that a large part of the year-round populated area lies in the red hazard zone. The municipality of Embd has drawn up a construction project to ensure the protection of local residents. A new protective dam will be built in the area of the existing turning area to the east (55.00m). The dam will be constructed using an earth-reinforced supporting structure. Before the embankment is built, some preliminary work must be carried out
Requirements
- Tight space conditions
- 3D model on excavator