Visp

Superstructure/works management vocational school

  • Client: Canton of Valais Department of Real Estate
  • Site management/reference person: Sterren-bm, Martin Sterren
  • Site manager: Mathias Wyssen
  • Foreman: Paulo Oliveira
  • Construction period: June 2023 - December 2024
  • Construction costs: 450'000.-

Technical data:

  • 800 m³ excavation
  • 1400 m² pavement demolition
  • 180m PP sewer pipe DN800mm
  • 2000 m² surfacing with gravel scattering
  • 250 m steel end angle

Project description:

The vocational school building in Visp was newly built and the associated outdoor area was designed in 2023. In the course of the work, various pipes were renewed, walls erected and surfacing areas modernized to create a functional and attractive environment.

Requirements:

  • Work adjacent to ongoing school operations
  • Short construction time
  • High demand for precision

Special features:

  • Surfacing with gravel
  • Various art objects to be moved

Contact persons

Mathias Wyssen

HF technician / SBA construction foreman

+41 27 948 05 15

mathias.wyssen@volken-group.ch