Täschwang avalanche diversion dam

  • Client: Municipality of Täsch
  • Site management/reference person: IBR Ingenieurbüro GmbH, Daniel Bumann
  • Site manager: Adem Salihi
  • Foreman: Franz-Josef Lauber
  • Construction period: Fall 2020-Fall 2022
  • Construction costs: 430`000.

Technical data:

  • Diversion dam
    • 450m length
    • 5-11m height
  • 6250m³ topsoil removal
  • 25`000m² topsoil placement
  • 39`000m³ excavation
  • 2`000m³ rock removal
  • 2`000m³ boulders
  • 30`000m³ embankment fill

Project description:

As Zermatt was cut off from the outside world by several avalanches in the avalanche winter of 2018, an avalanche deflection dam is being built. The project includes the construction of the avalanche deflection dam and the creation of a construction slope. This protective dam is being built to protect the population from avalanches.

Requirements:

  • Work only possible from summer to fall due to avalanche risk
  • The construction site could only be carried out by well-trained and experienced personnel
  • Removal and application with 3D excavators

Contact persons

Adem Salihi

Head of Special Civil Engineering Department

+41 27 948 05 08

adem.salihi@volken-group.ch