Visp

Wereija residential development

  • Client: Sägematte Asset AG, Visp
  • Construction management / Contact person: bpm Schmidt, Visp
  • Site manager: D’Onofrio Pierluigi
  • Foreman: Peixoto Daniel 
  • Construction period: February 2023 – June 2025
  • Construction costs: CHF 9.5 million

 

Technical data: 

  • 15,000 m³ excavation 
  • 1,400 m³ UG 0/45 
  • 15,500 m² wall formwork type 2 
  • 1,900 m² parapet formwork type 2 
  • 14,000 m² ceiling formwork type 2 
  • 800 tons of reinforcement
  • 7,200 m³ of concrete
  • 4,600 m² of masonry

 

Property description: 

Four modern apartment buildings with spacious 3.5-, 4.5-, and 5.5-room apartments are being built in Visp-West. The central location offers maximum living comfort: various shopping facilities, the post office, a sports field, and the train station are only a few minutes' walk away. This residential complex combines urban living with optimal infrastructure and short distances for everyday needs.

Requirements: 

  • Short construction period  
  • Excavation work in groundwater 

Contact Persons

Pierluigi D'Onofrio

Head of Pollutant Remediation Department /
Head of underlayment department /
Technician HF / Site Manager SBA

+41 27 948 05 14

pierluigi.donofrio@volken-group.ch