- Client: Sägematte Asset AG, Visp
- Construction management / Contact person: bpm Schmidt, Visp
- Site manager: D’Onofrio Pierluigi
- Foreman: Peixoto Daniel
- Construction period: February 2023 – June 2025
- Construction costs: CHF 9.5 million
Technical data:
- 15,000 m³ excavation
- 1,400 m³ UG 0/45
- 15,500 m² wall formwork type 2
- 1,900 m² parapet formwork type 2
- 14,000 m² ceiling formwork type 2
- 800 tons of reinforcement
- 7,200 m³ of concrete
- 4,600 m² of masonry
Property description:
Four modern apartment buildings with spacious 3.5-, 4.5-, and 5.5-room apartments are being built in Visp-West. The central location offers maximum living comfort: various shopping facilities, the post office, a sports field, and the train station are only a few minutes' walk away. This residential complex combines urban living with optimal infrastructure and short distances for everyday needs.
Requirements:
- Short construction period
- Excavation work in groundwater