We have well-established safety measures in place to protect our employees and the environment.
The existing protective dam in Baltschieder is being expanded by the Volken Group. The reservoir’s storage capacity, currently 40,000 cubic meters, will be increased to a total of 130,000 cubic meters. To achieve this, the dam will be raised, the channel widened, and the culvert near the cantonal road significantly enlarged. Climbing formwork is being used to raise the dam. The material for backfilling the dam was processed directly on site. The expansion of the dam and the widening of the channel will protect the residents of Baltschieder from flooding and sediment.