Our teams consist of people from all over the world who work hand in hand with one another.
To ensure that the village of Kalpetran and the tracks of the Matterhorn-Gotthard Railway continue to be protected from rockfall in the future, the Volken Group will be implementing various elements by autumn 2024. The existing construction road will be widened to a width of 3.5 m so that the earth embankment can be raised and optimized over a length of around 200 m - with an earth-reinforced supporting structure and a block throw. Work can only be carried out in this danger zone in good weather, and access via the MGB tracks is only possible with a 3-axle vehicle.