Raron

Jabil, Cooling System Remediation and Fire Protection Upgrade

  • Client: Lauber Iwisa AG, Naters
  • Site management / Reference person: Lauber Iwisa AG, Naters / Cina Cédric
  • Foreman / Foreman: D'Onofrio Pierluigi / Schwery Sebastian
  • Construction time: November 2015 to August 2016
  • Construction costs: CHF 1.2 million

Technical data:

  • 1'700m3 excavation
  • 550m3 concrete
  • 60 tons of reinforcement
  • 650m2 Slab formwork
  • 1'600m2
  • Wall formwork 3'000m2
  • Covering 90m3
  • Disposal of inert material 52m3
  • Disposal of mercury 5-10 mg/kg 88m3
  • Disposal of mercury 2-5 mg/kg

Description of the project:

Synthes Produktions GmbH in Raron had started a project to reduce the temperature in the production buildings by installing a ventilation system. The plant wanted to build a new hazardous materials storage facility to store flammable substances, oils and chemicals properly. The new facilities and systems needed space, so various infrastructure buildings were built.

Requirements:

  • Disposal of inert material in Chalchofen Gampel final landfill site
  • Treatment and disposal of 2-10mg/kg mercury
  • Set prefabricated double walls
  • High occupational safety requirements (weekly inspection from Milan)

Contact Persons

Pierluigi D'Onofrio

Head of Pollutant Remediation Department /
Head of underlayment department /
Technician HF / Site Manager SBA

+41 27 948 05 14

pierluigi.donofrio@volken-group.ch

Sebastian Schwery

Swiss certified foreman

+41 79 197 20 39

sebastian.schwery@volken-group.ch