Expansion of MGB Glisergrund depot

  • Client: Matterhorn Gotthard Infrastruktur AG, Brig
  • Site management/reference person: Markus Heinzmann / Emch+Berger AG
  • Site manager: Adem Salihi / Celine Ludi
  • Foreman: Sebastian Schwery / Marco Gruber
  • Foreman: Daniel Maric
  • Construction period: May 2021 / under construction until December 2025
  • Construction costs: 11.00 million

Technical data:

  • 25,900 m³ excavation type A & B
  • 19,200 m³ foundation layer
  • 2,700 m³ trench excavation
  • 750 m cable ducts
  • 1'330 m pipe block
  • 100 pcs. Cable shafts
  • 4,355 tons of surfacing work
  • 2,800 m ballast casting
  • 3,700 m³ ballasting
  • 850 m³ gravel sand PSS
  • 50 pcs. Mast foundations
  • 15 pcs. Anchor foundations
  • 10 signal foundations
  • 70 pcs. Dwarf signals
  • 3'350 m kerbstones
  • 7'685 m² formwork
  • 311 tons of reinforcement
  • 2'935 m³ concrete

Project description:

The Matterhorn Gotthard Railway (MGBahn) is comprehensively modernizing its vehicle fleet. These developments require adjustments and extensions to the existing depots and workshops in Glisergrund. Eastern and western hall extensions, a new underfloor lifting system, a new washing facility and several conversion works in the existing buildings are being realized. At the same time, the track field and the signal box are renewed. New sidings, a new outer pit, a new track share and new catenary systems will be installed in the track field. In addition, the substructure, superstructure and drainage will be brought up to the current state of construction, and the safety installations and service lines will be adapted or supplemented accordingly.

Requirements:

  • Work during rail operations
  • Work under traffic (railroad operation) with tight space conditions
  • Complicated logistics as a result of restricted access routes, handling areas
  • Two-shift operation (night and day work)

Contact person

Sebastian Schwery

Federal dipl. foreman

+41 79 197 20 39

sebastian.schwery@volken-group.ch

Marco Gruber

Foreman 

Adem Salihi

Department Manager Foundation Engineering

+41 79 755 23 92

+41 27 948 05 48

adem.salihi@volken-group.ch

Daniel Maric

Foreman