Gampel

The arch is taking shape: Interior work on the A9 Riedberg Tunnel.

The Volken Group is currently working as part of a consortium consisting of Frutiger AG and Prader Losinger AG on the interior construction of this highway tube near Gampel-Steg. A self-compacting concrete is being used as the inner ring, which is AAR-resistant (chemical reaction that can lead to cracks) and can withstand frost and de-icing salt. The construction of the tunnel arch from around 73 m3 of concrete is challenging, as the entire pressure has to be absorbed by mobile formwork - a formwork carriage.

Benefits with the Volken Group

Open to different cultures

Our teams consist of people from all over the world who work hand in hand with one another.

Safety first

We have well-established safety measures in place to protect our employees and the environment.

Effective networks

We maintain strong relationships with partners, suppliers and customers.