Our teams consist of people from all over the world who work hand in hand with one another.
As a completely grounded Valais-based company, we are also open to the digital world with social media & co on the internet. Here you can see which photos and video reports the Volken Group regularly posts on Facebook, Instagram and YouTube.
In collaboration with the construction company E. Lauber & Sohn Hoch- und Tiefbau AG, the Volken Group and the WALABA consortium are carrying out the master builder work for the ne...
Swissgrid began construction work on the new high-voltage line between Mörel-Filet and Ernen this spring. Nine pylon foundations will be constructed by the Volken Group by the fall...
Construction work on the Nelkenweg development has been underway since November 2020. Beautiful and modern 3.5, 4.5 and 5.5 room apartments are being built here in a prime location...
After the stairwell was demolished with a shorter excavator arm for space reasons, the 23m long arm is now in use. The various building materials are professionally separated and a...
Parallel to the excavation, the slope stabilization work is being carried out by our special civil engineering division (Valjetting AG) on the MFH Brigerbärg. This will ensure safe...
Machines with a total weight of 195 tons and a total output of 1733 hp are currently in operation at the Raspille in Salgesch. The "Raspille confluence" project provides for the re...
The covered "Steinschlag" cut is part of the Stalden bypass road and is 105m long. The two tunnel portals east and west are currently being built, which will later characterize the...
Excavation work on the Brigerbärg project began last week in beautiful weather and spring-like temperatures. Two apartment buildings are being built here in a quiet location with a...