Mörel-Filet

New pavement - cantonal road

  • Client: Canton Valais
  • Construction Manager / Reference Person: Reto Gasser
  • Construction Foreman: Antonio D'Onofrio
  • Foreman: Diego Barberi
  • Construction time: Nov./2021-Nov./2022
  • Construction costs: 2 million

 

Technical specifications:

  • 3000 m3 excavation
  • 500 m3 demolition pavement 
  • 1700 m3 unbound mixtures 
  • 850 a. Asphalt 
  • 200 m2 formwork type 4.1
  • 45 a.reinforcement
  • 400 m3 concrete

 

Object description:

On the construction site of the H19 Brig - Furka pass road, section Mörel - Filet, the infrastructure lines and the pavement were constructed. The complete body was renewed from scratch.

 

Special requirements:

  • Work during ongoing traffic (traffic lights)
  • Difficulties due to railroad crossings (safety at work) 
  • Short construction time