Simplon

New pavement - cantonal road (Kopie)

  • Client: Federal Roads Office FEDRO, Branch Thun
  • Construction Manager / Reference Person: IM Maggia Engineering SA / Christian Haldemann
  • Construction Foreman: Celine Ludi
  • Foreman: Herold Philipona
  • Construction time: June 2022 - November 2022
  • Construction costs: 2 million

 

Technical specifications:

  • 75m new road north 
  • 60m new road south 
  • 30m span bridge
  • 4.20m width road
  • 2'500m³ excavation
  • 380m² nail wall
  • 200m micropiles
  • 1'200m anchors
  • 350m³ concrete
  • 46t reinforcement
  • 510t pavement

 

Object description:

The execution works of the temporary bypass road and the auxiliary bridge serve to relieve the existing Fura bridge on the national road A9 (Simplon South). The southern and northern sections of the bypass road, consisting of the provisional excavation protection, retaining walls, both abutments incl. wing wall and roadway. The auxiliary bridge was designed and executed by the contractor.

 

Special requirements:

  • Auxiliary bridge planning and execution
  • Tight space conditions for bridge assembly
  • Short construction time
  • Work on national roads