- Client: Damian Seewer
- Construction Manager / Reference Person: Grand Adalbert Architekturbüro Leuk
- Construction Foreman: D`Onofrio Antonio
- Foreman: Pedro Oliveira
- Construction time: August 2019 until July 2020
- Construction costs: 2.7 Mio
Technical specifications:
- 4500 m3 excavation
- 3000 m3 concrete
- 350 to reinforcement
- 1000 m2 brick walling
- 4800 m2 wall formwork
- 2600 m2 slab formwork
- 150 m2 multi-layer slab of rock wool
Object description:
New building of the Leukersonne winery in Susten. The barrique cellar is in the basement. The ground floor and upper floor house the wine production, sales / tasting, warehouses and offices. The walls and ceilings of the basement are made of in-situ concrete. The walls and ceilings of the hall are made of in-situ concrete and partly of prefabricated concrete elements.
Special requirements:
- Building in groundwater
- Groundwater lowering (open dewatering)
- White tank
- Very short construction time
- Large spans (industrial construction)
- Combination of concrete prefabrication with in-situ concrete construction
- Ceiling heights up to 9 metres
- Complex buildings
- Corona measures Pandemic